Green Floating Marine Structures

Manufacturing Services

SHARE

Shipyard production and commissioning; The production of the WindBarge will utilize technical solutions and competence from the ship building industry of Norway. The original idea was to modify a simple barge, which resulted in a structure with large areas of flat and single curved steel plates. By basing the design on the well known barge-construction we can utilize decades of experience with design and production and incorporate this into the production of the Windbarge. This allows for the use of many already optimized solutions and production methods, reducing both time and cost

Most popular related searches

Quayside installation of the wind turbine
The WindBarge will have a low draft which allows the turbine installation to be carried out quayside. This gives the possibility to do the turbine installation at any place where there is a crane tall enough.