Aerovit Installation - Orlén Refinery, Lithuania - Case Study

Aerovit Installation - Orlén Refinery, Lithuania - Case Study

Situation BEFORE Aerovit Installation Orlen Lietuva Refinery has two boilers which are losing a considerable amount of heat due to catalyst dust build-up in the tubes. After two month of operation the boilers tubes are fully covered by catalysts dust, but Orlen ´s technicians cannot stop them for manual cleaning because it would imply ...

ByAerovit A/S


Aerovit Installation Vänersborg, Sweden - Case Study

Aerovit Installation Vänersborg, Sweden - Case Study

Situation BEFORE Aerovit Installation In 2011, Vattenfall Vänersborg installed 2 pcs of 15MW boilers (bio-oil) supplied by Compab in cooperation with Robert Bosch A/S. During the heating season December-March the boilers needed to be cleaned manually 3 times. Meaning a 2-days shutdown every time. Vattenfall wanted to eliminate the ...

ByAerovit A/S


Dry ice widely used in many fields to keep fresh & cold

Dry ice widely used in many fields to keep fresh & cold

The cleaning effect is strong. After cleaning, the molds are bright as new. 3. Power industry Dry ice can clean electric boilers, condensers and various heat exchangers, and can also clean power distribution cabinets. ...

ByQingdao Newtep New Energy Technology Co., Ltd.


Chemically Inclined: The Case for Clean Boilers

Chemically Inclined: The Case for Clean Boilers

Boiler cleaning is something most companies don’t want to think about — if boilers are working within operational limits it’s often easier to keep up with smaller preventative maintenance (PM) tasks but put off a total chemical clean until performance starts to suffer. ...

ByGoodway Technologies Corporation


Heating Plant Case Study

Heating Plant Case Study

Mounting of an AEROVIT system August 2005. Before the boiler had to be cleaned every 6. week The flue gas temperature was on a clean boiler 210°C The manual cleaning was executed by 250°C. Evaluation of the AEROVIT systems effect From 28 Nov. 2005 to 28 April the boiler is running full ...

ByAerovit A/S


How to prolong the service life of biomass fired boiler

How to prolong the service life of biomass fired boiler

Because of the shortage of energy and environmental deterioration caused by the extensive use of fossil fuel,biomass fired boiler has played a more and more important role in the industrial boilers.Therefore,we need to focus on the following aspects of work to ensure its normal operation and prolong its service life: Biomass fired boiler ...

ByZhengzhou Boiler Co., Ltd. (ZBG)


How To Prolong The Life Of Your Boiler

How To Prolong The Life Of Your Boiler

Regularly boiler maintenance will prolong the life of your boiler and improve efficiency, saving you money. ...

ByWaltham Technologies, Inc.


Gum Removal Equipment: Here`s What Sets Apart The Best From The Rest

Gum Removal Equipment: Here`s What Sets Apart The Best From The Rest

Many of the top-grade steam vacuums feature steam temperatures as high as 369ºF and pressure levels of up to 125 psi for improved cleaning action. In addition, high-quality vapor steam cleaning systems are equipped with self-cleaning boilers. ...

ByDaimer Industries Inc.


Aerovit Installation - MV Split, Croatia - Case Study

Aerovit Installation - MV Split, Croatia - Case Study

The boiler had to be stopped for cleaning every 700-1000 hours of work, depending on the duration of the voyage. Upon arrival at ports, engine crew were busy with boiler cleaning, so they had less time for other necessary maintenance ...

ByAerovit A/S


Värnamo, Boiler 1- E.ON, Sweden - Case Study

Värnamo, Boiler 1- E.ON, Sweden - Case Study

Mounting of an AEROVIT system August 2005 Before the boiler had to be cleaned every 6. week. The flue gas temperature was on a clean boiler 210°C. The manual cleaning was executed by ...

ByAerovit A/S


M.V. Split Vessel Case Study

M.V. Split Vessel Case Study

The boiler had to be stopped for cleaning every 700-1000 hours of work, depending on the duration of the voyage. Upon arrival at ports, engine crew were busy with boiler cleaning, so they had less time for other necessary maintenance ...

ByAerovit A/S

  • Previous
  • Next
Need help finding the right suppliers?Try XPRT Sourcing. Let the XPRTs do the work for you
Back to top
About Energy XPRT

Energy XPRT is a global marketplace with solutions and suppliers for the energy sector, with product catalogs, articles, industry events, publications & more.

Channels

Solutions

  • Energy XPRT Industry Products
  • Energy XPRT Industry Software
  • Energy XPRT Industry Training
  • Energy XPRT Industry Services
  • Energy XPRT Industry Applications

Latest

  • Energy XPRT Industry News
  • Energy XPRT Industry Events

Publications

  • Energy XPRT Industry Articles
  • Energy XPRT Industry Books
  • Energy XPRT Industry Magazines
  • Energy XPRT Industry Downloads
  • Energy XPRT Industry Videos

Companies

  • Energy XPRT Industry Companies

  • FAQs
  • Company sitemap
  • Category sitemap
Energy XPRT is part of XPRT Media All Rights Reserved.
Terms
Privacy
  • Energy XPRT RSS List
Our sites:
Environmental XPRT
Agriculture XPRT
Medical XPRT
XPRT