Project Details Location: Permian Basin Flow Rate HP: 1.5 MMSCFD HP Inlet Pressure (ΔP): 50-75 PSIG Flow Rate LP: 20.0 MSCFD LP Inlet Pressure (ΔP): 4 oz/in.2 Smokeless %: 100% Pilot & Controls: ProFire 2100 & 1300 Solar Package: No Electricity Required Installed Year: 2017Installed Year: 2017 Aereon’s ...
PROJECT DETAILS Location: Permian Basin Flow Rate LP: 20.0 MSCFD LP Inlet Pressure (ΔP): 4 oz/in.2 Smokeless %: 100% Pilot & Controls: ProFire2100 Solar Package: No Electricity Required Installed Year: 2017 Aereon’sGhost Series Enclosed Combustor (EPA Certified for Quad O Compliance) is used to burn off waste natural ...