Refine by
Independent Power Producer Articles & Analysis
27 articles found
Project summary The project is a 7.5 MW solar PV plant in Mubuga, Burundi. The expected interconnection in Q3 2020 will increased the installed electricity capacity in Burundi by 14%. Partners include the UK’s Renewable Energy Performance Platform (REPP), Inspired Evolution, Africa Trade Insurance Agency (ATI), the U.S. Int'l Development Finance Corporation (DFC, formerly the Overseas ...
With the advent of more storage options every day, you and your solar plant will behave differently. No longer will you be pushing power onto the grid, based upon the amount of sunshine or the middle of the day. You will now be working with the utility, like an Independent Power Producer (IPP). This is why Dispatchable ...
OWNER Manisa OIZ LOCATION Turkey PRODUCT Two Titan 250 Generator Sets CUSTOMER VALUE High Efficient and Flexible Energy Supply Our customer, Manisa OIZ, one of the biggest industrial parks in Turkey, needed to fulfill the rapidly growing demand of electricity, as well as provide steam and hot water to their industnal tenants. We extended the capacity of their power plant with two of our ...
OWNER Pioneers Power Limited LOCATION Yemen PRODUCT Six Taurus 60 (5.5 MWe) Gas Turbines CUSTOMER VALUE Flared Gas for Grid Power The Government of Yemen together with Pioneers Power Limited elected to take steps to comply with worldwide flare reduction policies. They found the right solution was to generate electricity using associated gas containing heavy hydrocarbons. A new power plant was ...
OWNER Genser Energy LOCATION Tarkwa, Ghana PRODUCT PGM130 Powered by Titan™ 130 CUSTOMER VALUE Reliability, Responsiveness, Cost Savings Genser Energy is an independent power producer headquartered in the USA with operations across West Africa. ...
The project is also the first grid-connected solar development by an independent power producer (IPP) in Burundi. It is hoped the success of the venture will pave the way for further foreign investment into the country’s renewable energy sector by demonstrating the government’s increased capacity - and willingness - to enter into ...
But the manufacturer added it believed India’s wind power industry was "entering a phase of robust growth" following the announcement of future auctions. ...
South Africa's 2010 Integrated Resource Plan (IRP) targeted 8.4 GW of wind and 8.4 GW solar capacity by 2030 and in 2011 the government launched its Renewable Energy Independent Power Producer Procurement Program (REIPPPP) to accelerate development. ...
South Africa's 2010 Integrated Resource Plan (IRP) targeted 8.4 GW of wind and 8.4 GW solar capacity by 2030 and in 2011 the government launched its Renewable Energy Independent Power Producer Procurement Program (REIPPPP) to accelerate development. ...
Largely propelled by the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) which commenced in August 2011, the scheme has procured 79 projects with a capacity of 5,243 MW under the four bid windows, which is more than one-quarter of the national renewable energy target of 17,800 MW by 2030. ...
In a document published on December 31, MASEN said this phase will include “one or more projects expected to be developed under an [Independent Power Producer] scheme with hybrid CSP-PV technology and an installed capacity of around 400 MW per ...
Close to 60 percent of our funding—that’s $4.8 billion—is focused on renewable energy development, especially concentrated solar power (CSP) and geothermal power. These technologies hold tremendous long-term promise but also high up-front investment risks that concessional financing like the CIF can help overcome. ...
As technology costs keep tumbling, centralized and decentralized renewable projects such as these will become increasingly attractive, especially when compared with the costly diesel fuel generation that provides much of the continent’s power in rural areas. Yet, as reporter Tom Jackson previously pointed out in this magazine, hundreds of millions of Africans — ...
ByEnsia
Whole areas of Cape Town and Johannesburg are without power for hours at a time, a “last resort” Eskom is forced to resort to on a regular basis. ...
ByEnsia
James Anderson of report authors Wind Energy Update said: “South African wind energy continues to establish itself this year as the Department of Energy and IPP office select preferred bidders for the latest round of the hugely successful Renewable Energy Independent Power Producers Programme (REIPPP). The experts quoted in the report ...
Indian electricity market is trading with power transactions through power exchanges. Practically, Indian power market structure consists of the central generating station, state generation and power producers. This paper describes the methodology to utilise the central generating station and state owned ...
By Jenny Muirhead The DOE released a statement on 12 December 2014 outlining the outcomes of both Window 3 and the CSP-specific Window 3.5 under its Renewable Energy Independent Power Producer Procurement Program (REIPPPP). According to the CSP Today Global Tracker, South Africa now has over 500 MW in development, 400 MW of which have been ...
We have a wealth of experience in CSP but as explained, we are new to the bidding process and for that reason we made the decision to join forces with GDF Suez, who is the biggest Independent Power Producer [IPP] in the world. This made for the perfect partnership, GDF with their experience in bidding and Masdar, with its experience in CSP We ...
Today, most renewable energy programs provided by utilities only offer customers Renewable Energy Certificates (RECs)—the green power associated with them may or may not be produced or used locally. ...
Most gas engines are used as base load units, run grid parallel and operate continuously but significant numbers are being used in island mode. In some cases power may be wheeled through the grid to the end user from the power producer. ...