Shenyang Getai Hydropower Equipment Co., Ltd

GetaiModel ZDJP502-LH-240 - Kaplan and Tubular Runner

SHARE

Design for low head and large water flow hydropower station.Under the same water head, its specific speed is higher compared with the Francis turbine. Application water head is about 3-80m. Axial-flow turbine runner for Feng Huang HPP.