wind-site Downloads
31 downloads found
The SG 2.1-114 is the benchmark for medium and low wind sites thanks to its low power density, which allows maximum profitability. ...
The redundant converter topology ensures the optimum pitch of the rotor blades at all times according to the latest safety guidelines.eno ops.control®Evolutionary closed-loop controlThe solution of an integrated control system based on an open, web-based SCADA connection controls all process sequences - from operational management via pitch control to wind farm networking - ...
Special innovated detailed solutions, combined with robust engine construction making the eno 126 to a solid investment in the new generation of wind turbines in long-term. With a coated area of 12,500 m2² it is ideal for the low wind sites. ...
Highest efficiency – This is what construction and design of the eno 100 stands for. Based on the established platform of eno 92 added by a rotor diameter of 100 meters and with this about 18 % more swept area, the eno 100 combines optimally compactness, solid engineering and much increased yields. The design of eno 100 is specialy developed to maximize the exploitation of low wind sites. ...
The LTW90 wind turbine was specially designed for low-wind sites. Thanks to the large rotor surface area, it ensures significant power generation and is perfectly suitable for a wind class of up to IIIA+. ...
Suzlon’s new S120 wind turbine generator, built on the highly successful 2.1 MW platform is set to improve the ROI for customers and a new benchmark in the wind industry. Wider rotor diameter of 120 metres with swept area of 11,225 sq. meters. Suitable for low wind sites IEC Class S. Next-generation controls with state-of-the-art software. All new individual pitch control ...
This is very dependent on the quantity and quality of the wind resource at your site. The higher the average wind speed at your location, the more power will be produced. Output from a single turbine at an open site with 5 m/s average wind speed should be over 400 kW hours annually. At a 6 m/s ...
What does your company/organization do within the wind industry? Communications Community Wind Education Financial Grassroots Legislative O&M Offshore R&D Safety Siting Small Wind Supply Chain Transmission Transportation UtilityInterests:CONTACT INFORMATION (please complete all fields)Company Name Company Website ...
Friday, 5 September 2014Olkaria II08:00 Delegates to meet at reception of Safari Park hotel08:30 – 09:15 Transfer to solar siteNgong wind farmOur first stop will be to the Ngong Power Station wind farm which began with two wind turbines commissioned in1993 as a donation from the Belgian Government. These have since been retired. The second phase ...
In an age of King-sized wind turbines designed for wide open spaces, Aeronautica Windpower is proud to introduce the 750 Series: Three-Quarter megawatt, 'Queen-size' machines designed for 'distributed wind' applications. Many good wind sites just cannot accommodate huge, utility-scale turbines. It is also ideal to be utilized for maximization of many state net metering legislations in place. A ...
The Model 300 turbine is one of the most versatile and modern turbines designs on the market today having proven itself reliable in harsh tropical and artic conditions. Suitable for high and medium wind speed sites, the turbine is compact and portable, with easy shipping. The complete turbine assembly is shipped quickly in a standard cargo container anywhere in the world and can be erected in one ...
GE’s 1.85-82.5 Wind TurbineGE’s 1.85-82.5 wind turbine is now the turbine of choice for IEC class II winds, providing over 7% more AEP than the 1.6-82.5 at 8.5 m/s. This provides greater energy output at rated wind speed and drives improved project economics for wind developers. GE’s proprietary Advanced Loads ...
Speed up renewable energy development projects and get to construction faster. Pivvot streamlines wind, solar, and storage site analysis with location intelligence. ...
Whilst it may not cover all possible Radar, Aircraft, Communications and Radio issues, it provides an overview of those issues that may affect the site’s suitability for a Wind Farm development that may need further consideration. ...
GE’s 2.85-100 Wind TurbineGE’s 2.85-100 wind turbine offers a 3% increase in Annual Energy Production (AEP) at 8.5 m/s when compared to the 2.75-100 wind turbine. This nameplate rating increase allows greater energy capture and improved project economics for wind developers. GE’s proprietary 48.7 meter blade uses the same proven ...
The Model 500 is an efficient and powerful turbine specifically designed and optimized for low to medium wind sites, without comprising the robust design features required for installation in the most harsh tropical and artic conditions. It is based on the proven and reliable Model 300 turbine, and retains the easy shipping, self-erecting, portable attributes required for low-cost distributed ...
www.otti.dewww.otti.deOTTIPre-Conference Seminar© Trama TecnoAmbientalBasics ofSmall Wind TurbinesWednesday, April 28th, 2010Palau Firal i Congressos de TarragonaTarragona, SpainMini-Grids2010ProgrammePre-Conference SeminarBASICS OF SMALL WIND TURBINESPalau Firal i Congressos, Tarragona, Spain – April 28th, 2010Small wind turbines can be combined ...
We carry out wind and solar atlas on a regional scale : we assess wind potential and synthesize the environmental and technical issues with a Geographical Information System database (Aquitaine, Limousin, PACA, ...)Why wind measurement?The wind farm development needs a precise knowledge of the energy resources, in the way to:• ...
ByVALOREM
Wind power opportunities for landownersThe Infinis group (“Infinis”) is actively seeking new opportunities for wind development across the UK. ...
Surmounting 20% by 2030Intermittent Resource Hurdles to Realize a Continuous Clean Energy Source and Meet the“Directive.”July 13-14, 2010Denver, COOvercoming the challenges of wind power generation including integration, market investment, variability, and siting in order to create a seamless implementation process.Steve HerlingVice President, Transmission ...