This is the first install for the T-MH turbine. The turbine was tested with francis and propellor runners. Several different generators and alternators were also tested. ...
CHC provided two 2500 mm replacement Francis runners to fit to the existing draft tubes. The new turbines provided a combined generating capacity of 2.0 MW. ...
CHC provided three 890 mm replacement Francis runner assemblies as part of the Gorham Hydro upgrade project. ...
The plant’s configuration consists of six quad-Francis assemblies, each assembly having four runners on one shaft. ...
In 2010, CHC supplied a 1225 mm camel back turbine assembly consisting of a left and right handed 1225 mm horizontal double Francis runners with main turbine shaft and distributor assembly. The new equipment was designed and manufactured to fit to the existing draft tube and was commissioned in 2011. ...
The powerplant, located on the Clyde River in Newport, VT, is one of four hydro plants owned by the hydro developer and is a three unit production facility with an operating capacity of over 7 MW. Two of the plant’s Francis runners have been replaced with new equipment. In 2010, CHC provided a new 620 mm Francis runner to ...
In 2012, CHC provided 1160 mm replacement Francis runners for two of the plant’s eight older units. PROJECT FACTS 980 kW Minimum Flow Turbine 1500 mm Axial Flow Propeller 1000 kW/360 RPM Vertical Synchronous Generator Commissioned 2004 ...
The small hydro power plant Želina built on Ohre river has been commissioned since1908 year and these days is being listed as technical heritage of the Czech Republic. Generating technology is still oparated by CEZ. Scope of Želina power plant works is complete overhaul and modernization of two Francis turbine units, installation of new intake trash racks, up-grading of trash raking machines and ...