Year: 2017 Running Gear: Vertical shaft Kaplan turbine with synchronous generator. Scope: Replacement control system and exciter. ...
Year: 2021 Running Gear: 2 Vertical shaft Francis turbines with synchronous generators Scope: Replacement of control system, exciters, and HPUs Originally part of a large cotton mill complex in North Carolina dating back to the 1800s, this 1 MW hydropower plant stayed in operation into the 2000s, longer than the rest of the declining mill town. ...
Year: 2018 Running Gear: Three units: One vertical shaft Francis turbine with synchronous generator. One horizontal shaft turbine with synchronous generator. One horizontal shaft double-runner turbine with synchronous generator. Scope: Replacement control system, switchgear, and HPU. ...
Year: 2018 Running Gear: 2 Vertical shaft Francis turbines with synchronous generators Scope: Replacement of control system and exciters This hydroelectric plant is located in central MA on a highly developed river, with multiple hydro plants operating both upstream and downstream of the project. Originally constructed in 1918 by a local manufacturing ...
Year: 2022 Running Gear: 2 vertical shaft Francis turbines with synchronous generators Scope: Replacement of control system, excitation, and governors Set in a resort town in the mountains of North Carolina, this hydroelectric project was originally constructed in 1925-1926 by a private developer. ...
Year: 2016 Running Gear: 3 units: Vertical shaft synchronous generator driven by a Francis turbine. Vertical shaft synchronous generator driven by a propeller turbine, and a vertical shaft induction generator driven through a flat belt by a Kaplan turbine. ...
Stistics: Turbine: One single nozzle Pelton Generator: One 150kW single phase synchronous generator @ 1200 RPM Rated head: 305m Rated flow: 0.057m3/sec Commissioned: 2012 This is one of two micro hydro power plants built for the supply of electricity to an equestrian center, which consists of three large farm buildings and one house. ...
Commissioned in 2012, CHC provided an additional 1650 mm conventional Kaplan turbine-generator set which was added on the low level outlet of the dam, and which produces over 6.7 MW of additional power using the water that spills over the dam. The complete equipment package supplied by CHC for the project included draft tube elbow and extension, double-regulated turbine heart ...
Two new generating stations, Long Rapids and Twin Falls, located on the Namewaminikan River in Northern Ontario were commissioned in the spring of 2017. CHC provided a total of four 1850 mm axial flow Kaplan turbines with synchronous generators and hydraulic power units. The Namewaminikan hydro development has a combined output of 10 MW. ...
The equipment package also included six new vertical synchronous generators. The installed capacity of the Orono “B” plant is 3.7 MW and the Stillwater “B” plan produces an additional 2.2 MW. ...
In 2004, Great Bay Hydro Corporation acquired four generating facilities in Vermont, including the West Charleston Hydro plant which had been out of operation and abandoned for a number of years. ...
Located in the picturesque town of Almonte, on the North bank of the Mississippi River, the Enerdu redevelopment project involves expanding the footprint of the original powerhouse out into the river to accommodate larger turbines and to increase the plant’s generating capacity by 70%. CHC provided a water-to-wire equipment package including two 2000 mm Axial Flow Kaplan ...
CHC provided a water-to-wire package consisting of two 1250 mm axial flow Kaplan turbines with 1035 kW/450 RPM synchronous generators, switchgear and controls package. This redevelopment project began operations in July 2002, was constructed in only 13 months and commissioned ahead of schedule. ...
Commissioned in the Spring of 2016, this new 9.2 MW powerhouse, located on the Menominee River on the border of Wisconsin and Michigan, houses two vertical 2500 mm axial flow Kaplan turbines with 4600 kW / 240 rpm synchronous generators, hydraulics and unit controls provided by CHC. The new plant and spillway were built to replace the original ...
The Milford generating station, now owned and operated by Brookfield Renewable, is located on the Penobscot River in the State of Maine. ...
CHC provided a 1250 mm axial flow turbine for the new powerplant with a 1250 kW/514 RPM synchronous generator. The new plant can produce up to 1.25 MW of power. ...
The hydroelectric facility is owned and operated by PPL Generation LLC and is a ten unit facility with an installed capacity of approximately 108 MW. CHC provided two 1350 mm vertical Francis auxiliary units and two synchronous generators to replace two decommissioned units. The new units were put into operation in 2010 and have a combined ...
CHC provided two identical water-to-wire equipment packages, each including a 1250 mm axial flow Kaplan turbine, 900 kW/450 RPM synchronous generator hydraulic power unit and switchgear, controls and protection package. ...
This historic dam rebuilding project was completed in June 2012, and involved the installation of an additional low-flow generating unit. The water-to-wire equipment package supplied by CHC included a 1250 mm vertical axial flow Kaplan turbine, 550 kW/400 RPM synchronous generator with switchgear, controls and protection package. ...
The Higley generating station was built in 1913 and is located on the Raquette River in the State of New York. ...