CHC provided a total of six 1700 mm axial flow turbines, a set of three for each plant, each plant receiving two single-regulated and one double-regulated turbine. The equipment package also included six new vertical synchronous generators. The installed capacity of the Orono “B” plant is 3.7 MW and the Stillwater “B” plan produces an additional 2.2 MW. ...
Located in the picturesque town of Almonte, on the North bank of the Mississippi River, the Enerdu redevelopment project involves expanding the footprint of the original powerhouse out into the river to accommodate larger turbines and to increase the plant’s generating capacity by 70%. CHC provided a water-to-wire equipment package ...
In 2008, the dam was retrofitted for the secondary purpose of power generation. CHC supplied a water-to-wire equipment package consisting of two (2) 1250 mm axial flow pit turbines, along with two 1215 RPM induction generators, gearboxes, hydraulic power units, switchgear and controls package. ...
PROJECT FACTS 9.2 MW Plant Capacity Water-to-Wire Equipment Package Two (2) 2500 mm Axial Flow Kaplan Units Net Head: 14 m (43.1 ft) Output: 4583 kW per unit Commissioned 2016 ...
The Oswegatchie Hydro facility is located on the Upper Oswegatchie River in the Adirondack Mountains of Northern New York. CHC provided a water-to-wire package consisting of two 1250 mm axial flow Kaplan turbines with 1035 kW/450 RPM synchronous generators, switchgear and controls package. ...
The Canal Boba and Las Barias Hydro projects were developed by the local Dominican utility with the Montreal engineering firm of Dessau Soprin. CHC provided two identical water-to-wire equipment packages, each including a 1250 mm axial flow Kaplan turbine, 900 kW/450 RPM synchronous generator hydraulic power unit and switchgear, controls and ...
The existing units remained in service during construction of the new powerhouse providing uninterrupted power generation.In addition to the turbines, the equipment package supplied by CHC included two 1575 kW/450 RPM synchronous generators, hydraulic power units, switchgear, controls and protection package. The new plant was commissioned in 2003 and the turbines ...
CHC provided a complete water-to-wire equipment package to the City of Black River Falls, Wisconsin, for the upgrade of its Black River Falls Hydroelectric Dam, located on the east bank of the Black River in Jackson County, Wisconsin. This historic dam rebuilding project was completed in June 2012, and involved the installation of an additional ...
Located on the Androscoggin River in Maine, the Livermore Falls hydro project required the installation of a turbine unit that would meet government minimum flow requirements on the river. CHC provided a water-to-wire equipment package which included a 1500 mm axial flow propeller turbine along with generator, hydraulic power unit, ...
Lockhart Power is the owner and operator of a number of hydro projects located in South Carolina. In 2011, CHC provided two water-to-wire packages for two new Lockhart hydro sites: a 1250 mm vertical axial flow Propeller minimum flow unit with generator and controls for the Lockhart Minimum Flow project and a 1700 mm axial flow Kaplan turbine ...
The hydro plant which had been decommissioned in the early 1950’s was put back in operation in 2013. CHC provided a water-to-wire equipment package including a 1250 mm axial flow Kaplan turbinedirect connected to a 250 kW/514 RPM induction generator along with complete plant controls. ...