- Case study - RDF plant Tel Aviv
Case study - RDF plant Tel Aviv
Courtesy of Eggersmann GmbH
Engineering and planning, procurement, production and delivery of the complete plant engineering as well as installation and commissioning.
Retention:
September 2012
Throughput:
540,000 Mg/a
Operational time:
at least 6,200 Mg/a
Input:
municipal solid waste, commercial and industrial waste
Recovery rate:
more than 50%
Materials for further processing:
- RDF (160,000 Mg/a)
- Paper and cardboard (20,000 Mg/a)
- Ferrous
- Non-Ferrous
- Plastic
- PET
- PVC
- biowaste / organic waste
Mechanical treatment:
- Shredder
- Screendrum
- Air belt separator
- Bag opener
- Ballistic separator
- Non-ferrous-separator
- Ferrous-separator
- NIR-devices
Commissioning:
End of 2015
-