Client - Oil Refinery, Eastern Europe
Project - Heavy Oil Pre-Heater As part of an overall facility upgrade this major oil refinery decided to seek ways of reducing its heavy oil pre-heating costs. A proposal was submitted that would enable waste heat from the refinery to be used as the source to safely pre-heat the stored heavy oil. The solution proposed the use of a gas to water recovery unit coupled to two heat pipe based oil ...
-
Biomass gassing as an effective source of energy
Type HOFGAS®- IFM4c 4000/2100 Performance 2100 Nm3/h / 3500 kW Location Limoges (FR) Situation A prestigious gassing plant for biomass is being built in the heart of France. The owner is promising himself a significantly higher level of efficiency through biomass gassing instead of biomass incineration. The plant is operated by feeding it with sawdust and wood chippings. ...
-
What You Must Know Of The Oil Sludge Pyrolysis Plant
Oils sludge is derived from drilling, exploration, and the whole process of refining different oil resources. It is made up of sludge, water, and oil which can result in environmental pollution when it is not processed properly. However, oil sludge contains a good amount of oil which creates favorable income opportunities. These are the factors why many investors are buying oil sludge pyrolysis ...
-
What Exactly Is An Oil Sludge Pyrolysis Plant?
Oil sludge is produced through drilling, refining, and exploration of numerous oil resources. It is composed of sludge, water, and oil, which could increase environmental pollution when they are not processed properly. Oil sludge is yet another valuable resource that offers the chance to produce money. This is the reason the reasons manufacturers are actually purchasing the oil sludge pyrolysis ...
-
Performance of the low-emission flare
Job report / Elbisgraben (Bale / Switzerland) The summer of 1992 had finally arrived. The 5MW low emission furnace in the district heating station Liestal was ignited, supplied with landfill gas from Elbisgraben landfill. Since then the plant has been running continuously and the comprehensive measurements taken, verify that all targets aimed at have been achieved: plant efficiency 90%, low ...