turnkey power plant Articles
-
Renovation of Dalkia’s Cogeneration Plant at Bron - Case Study
In 2009 Dalkia France informed Clarke Energy that it was going to replace their cogeneration plant at the Bron Parilly site, of which they are the operator. This was the first time Clarke Energy renovated a cogeneration plant on site. Three GE’s Jenbacher JMS616 GS-NL gas fuelled power plants were renovated at site for this turnkey installation. The electrical output of the engines has ...
-
21MW Peaking Plant Delivered to Ashford Power, UK - Case study
Clarke Energy delivered a full turnkey, design and build 21MW electricity generating peaking plant, at Ashford Power, Kings North Industrial Estate, Kent. The plant was delivered within a 40-week period, on time and on budget. The fully automated and unmanned site is monitored and controlled remotely, providing critical electricity to the National Grid at times of peak demand. When not in ...
-
Les Chênes Verts, Eiffage, greenhouse cogeneration plant - Case Study
Chênes Verts Energie has awarded Eiffage Energie as the main contractor of the renovation of an older generation greenhouse cogenerationplant in Chenes Verts’s greenhouses in Entressen. Eiffage Energie has a full turnkey installation with Clarke Energy who installed a J620 natural gas fuelled combined heat and power plant. As part of the contract with Clarke Energy, maintenance is ...
-
Ottawa Hospital, Ottawa Heart Institute, Ottawa, Ontario, Canada
Boiler Plant Application Objective The turnkey FLU-ACE waste heat recovery system was installed by Thermal Energy on four boiler exhausts from a power plant which produced a peak (winter) steam rate of 70,000 lbs/h. The system was designed to recover 10 mmBTU/h of otherwise wasted energy. The recovered heat is used to heat the the world-famous University of Ottawa Heart Institute Research ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you