Aerovit Installation Vänersborg, Sweden - Case Study
Situation BEFORE Aerovit Installation In 2011, Vattenfall Vänersborg installed 2 pcs of 15MW boilers (bio-oil) supplied by Compab in cooperation with Robert Bosch A/S. During the heating season December-March the boilers needed to be ...
-
Aerovit Installation - Orlén Refinery, Lithuania - Case Study
Situation BEFORE Aerovit Installation Orlen Lietuva Refinery has two boilers which are losing a considerable amount of heat due to catalyst dust build-up in the tubes. After two month of operation the boilers tubes are fully covered by ...
-
Oil Refinery, Russia - Case Study
Situation BEFORE Aerovit Installation. The diagram shows the steam production of one boiler. Right after the manual cleaning session the steam production is about 18t/h, then after 2-3 weeks decreasing to 11-12 t/h. The final result of the dust ...
-
Soot Blower System MV Höegh Trident, Denmark Case Study
Photos of economizer after app. 500 hours operation
-
Heating Plant Case Study
Mounting of an AEROVIT system August 2005. Before the boiler had to be cleaned every 6. week The flue gas temperature was on a clean boiler 210°C The manual cleaning was executed by 250°C. Evaluation of the AEROVIT systems effect From 28 ...
-
Soot-Blowing Equipment Hasselager, DK Case Study
With several years of experience with AEROVIT soot-blowing equipment and more than 400 installed. AEROVIT systems, we have collected a number of case stories from our many satisfied customers.
-
Aerovit Installation - MV Split, Croatia - Case Study
The boiler had to be stopped for cleaning every 700-1000 hours of work, depending on the duration of the voyage. Upon arrival at ports, engine crew were busy with boiler cleaning, so they had less time for other necessary maintenance work.
-
Värnamo, Boiler 1- E.ON, Sweden - Case Study
Mounting of an AEROVIT system August 2005 Before the boiler had to be cleaned every 6. week. The flue gas temperature was on a clean boiler 210°C. The manual cleaning was executed by 250°C
-
Grastorp District Heating Plant Case Study
Fuel: Wood chips and Salix. Boiler: 3.5 MW - installed 2002.
-
M.V. Split Vessel Case Study
The boiler had to be stopped for cleaning every 700-1000 hours of work, depending on the duration of the voyage. Upon arrival at ports, engine crew were busy with boiler cleaning, so they had less time for other necessary maintenance work.